July, 2006 390 24v Operator And 425 D Control Panel Installation Manual CONTENTS T HE 390 24V OPERATOR AND 425 D CONTROL PANEL: INSTALLATION MANUA
Page 10 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual 390 Limit Switch Instructions When Using 1 Limit Switch (Open or Clo
Page 11 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual 153682497351AABABCCDAFigure 1. The layout of a sample gate syste
Page 12 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual The 390 24v Operator
Page 13 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual Parts List 390 24v Operator POS PART NO. DESCRIPTION QTY 2 N/A
THE 425 D CONTROL PANEL GENERAL DESCRIPTION The FAAC 425 D control panel is used to operate the following models. Swing gate operators: 415 4
Page 15 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual THE 425 D CONTROL PANEL INSTALLATION INSTRUCTIONS Figure 1. The 425
Page 16 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual ACTIVATING DEVICES AND RADIO RECEIVER: The activating devices and
The closing leaf-delay time is adjustable from 1.5 to 10 seconds. NOTE: If the opening/closing time is set at less than the leaf delay time, the de
NO = Normally Open, NC = Normally Closed, C = Common, TX = Transmitter, RX = Receiver Figure 4. Common Accessories wired to 425 D Control
Page 19 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual LOGIC SETTING E P A ACTIVITATION COMMAND Open/Close/Open Open/St
Page 2 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual Both the installer and the owner and/or operator of this system need
Page 20 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual THE 425 D CONTROL PANEL INSTALLATION INSTRUCTIONS DISPLAY DESCRIPTIO
Page 21 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual THE 390 24VOPERATOR The FAAC 390 24V Operator requires no maintenan
July, 2006 390 24v Operator And 425 D Control Panel Installation Manual Page 22 TROUBLESHOOTING PROBLEM: THE GATE DOES NOT RESPOND TO AN ACTIVATING
Page 23 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual NOTES
To the original purchaser only: FAAC International, Inc., warrants, for twenty-four (24) months from the date of invoice, the gate operator systems an
Page 3 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual 6. It is extremely unsafe to compensate for a damaged gate by increa
Page 4 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual TECHNICAL DATA THE 390 OPERATOR Parameter Measure Voltage required,
Page 5 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual UNPACKING THE OPERATOR When you receive your 390 24 V Operator, compl
Page 6 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual THE 390 24V OPERATOR GENERAL CHARACTERISTICS The FAAC 390 24v Operat
Page 7 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual If the gate has to be operated manually in the event of a power outag
Page 8 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual A B C (max) a° 2¼”- 4¼” 4¼”- 5¼” 28¾” 90° 4¼”- 6¼” 4¼”- 5¼” 28¼”
Page 9 July, 2006 390 24v Operator And 425 D Control Panel Installation Manual Figure 6. Typical “overhead” outward swing mounting dimensions for g
Comments to this Manuals