Controlled-products-systems-group OH200DC User Manual Page 1

Browse online or download User Manual for Safety Controlled-products-systems-group OH200DC. Controlled Products Systems Group OH200DC User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - OH-200DC Installation Manual

®UL325compliantcompliantUL991LISTED®USOH-200DC Installation ManualCopyright © 2008 all-o-matic inc. www.allomatic.net WWW.ALLOMATIC.NETPending

Page 2 - TABLE OF CONTENTS

9V230V230115V115VG DRLIE 1NELIN 2All gate operators be properly grounded.A proper ground in a gate operator installation minimizes or prevents damage

Page 3 - To reduce the risk of

1/4 IN1/4 IN1 1/2 INSAFETY LOOPWHEN USEDEXIT LOOP8 FT4 FT4 FT8 FT4 FT4 FT4 FTTWISTED WIRE TO OPERATOROR CONTROL PANELGATETWISTED 6 TURNS PER FOOTWIRE

Page 4 - THE FOLLOWING:

The following loop installation guidelines are for installing typical driveway loops for access control applications (i.e. parking gates, sliding gate

Page 5 - DIFFERENT UL 325 CLASS TYPES

12CCPowerPowerDetectDetectLoop FailLoop FailResetReset22110000SENS.SENS.LEVELLEVELBOOST ONBOOST ONPULSEPULSEFREQ.FREQ.0000OFFOFFPRESPRES221111 22 33 4

Page 6 - OPERATOR INSTALLATION

13SAFETY LoopdetectorPHOTO BeamRelay (N.C.)MULTIPLE SAFETY DEVICES CONNECTIONSMultiple devices installed together must be connected in series . th

Page 7 - MOUNTING THE OPERATOR

This is a loop . Remember when connecting to an All-O-Matic circuit board from loop detector theYou must twist your wires from your exit point of

Page 8 - GATE TRAVEL ADJUSTMENT

15LEADING EDGE CONNECTIONLEADING EDGE SENSORConnect one of the wires from leading edge and/or one of the grey wires from a wireless edge receiver to

Page 9 - OPENING DIRECTION SETTINGS

16N.C.COMTHREE BUTTON STATIONSYSTEMConnect the from all the push buttonsto input on the board.Connect push button contact toinput on the board.C

Page 10 - ELECTRICAL CONNECTION

17EMERGENCY RELEASELocking Latch Release RingTo manually release pull locking latch to the side and pull release ring downward with a slit pull backwa

Page 11 - TYPICAL LOOP LAYOUT

18MEICAGN TL KOCSOLENOIDLOCKStep DownTransformerMAGNETIC/SOLENOID LOCK CONNECTIONSMagnetic lock installation requires a step down transformer with app

Page 12 - 1/4’’ Feeder Slot

1TABLE OF CONTENTSImportant safety instructions...Different UL 325 class types...

Page 13 - ACCESSORY CONNECTIONS

19RADIO RECEIVER CONNECTIONS3 wire receiver: mounts on receiver strip outside control box as shown below.4 wire receiver: connect the two relay wires

Page 14 - CONNECTIONS

20OPEN AND CLOSE ELECTRONIC REVERSING SENSOR(ERDs) ADJUSTMENTMAX MAXMIN MINSENSITIVITYCounter clockwise maximumsensitivityClockwise minimum sensitivit

Page 15 - LPR-1 LOOP RACK INSTALLATION

211 2 3 4 5 6 7 81 2 3 4 5 6 7 8-----------------------OPEN-------------------------------------------

Page 16 - LEADING EDGE CONNECTION

22DIP SWITCH FUNCTIONSTIMERTIMER switch “ON” activates the TIMER. See page 21 for details.RADIORADIO switch “ON” allows the radio receiver to override

Page 17 - THREE BUTTON STATION

23SOLAR PANEL CONNECTIONDR127-33043CL07 EC8RBL4MC68 AI2 M12214202300206 40100120M10101001MAAFS21B802360GBONOOUURRNN338866BBSS331133OOUURRNN338866BBSS3

Page 18 - EMERGENCY RELEASE

LED DIAGNOSTICSAC/PWR ON: Will be lit when AC power is ON.M/S LINK: Will be lit when master/slave communication is active.ALARM: Two states.1st state:

Page 19 - Transformer

OVERHEAD DIMENSIONS2516’’18’’13’’8’’144’’22’’2 5/8’’’ 6 1\44 1\28’’Custom track length up to 16ft upon request.

Page 20 - RADIO RECEIVER CONNECTIONS

IMPORTANT SAFETY INSTRUCTIONSTo reduce the risk of WARNINGinjury:READ THE FOLLOWING DIRECTIONS. DO NOT EVEN THINK OF STARTING UNTIL YOU HAVE READ AN

Page 21 - ADJUSTMENT

*Confirm that the gate operator being installed is appropriate for the application.*Confirm that the gate is designed and built according to current p

Page 22 - TIMER ADJUSTMENT

Class one: ResidentialA vehicle gate operator intended for use at a home of one to four single family dwellings, garages or parking area.Class Two: Co

Page 23 - DIP SWITCH FUNCTIONS

5OPERATOR INSTALLATION++With gate closed, mark the center of the gate.Lift gate to open position and mark the center point of the gate for the operato

Page 24 - SOLAR PANEL CONNECTION

6MOUNTING THE OPERATORMake sure end bracket is in the center of theopening. Bolt or weld the end bracket to wall. The operator bracket must be at leas

Page 25 - LED DIAGNOSTICS

7Gear boxGATE TRAVEL ADJUSTMENTLimit nut lock plateLimit nutsLocate limit switchesStep 1: Stop the gate operator using the three button station on the

Page 26 - OVERHEAD DIMENSIONS

8OPENING DIRECTION SETTINGS1002OOUURRNN338866BBSS331133OOUURRNN338866BBSS331133OOUURRNN338866BBSS3311331 2 3 4 5 6 8 7--E

Comments to this Manuals

No comments