ARM LAYOUT & OPERATOR PLACEMENT CONTINUED
Hinge point
Bracket
Bracket
Center shaft of
Operator
3
Measure distance from the
Y
Z.
point
And point Say distance is 60”,
divide this number by 2,which
=30”. This is the length of primary
PLEASE BE EXACT!!!
4
+
+
T his ARM section is half the distance
between point and point as shown
above.
Y Z
IT MUST BE EXACT!!!
This pipe does not need to be
measured after primary arm is
installed this pipe makes up the
balance of arm.
R
A
Y M E
P
I
M R
A
R
S CTIO
N
CENTER OF
BOLT AT FIRST
HINGE POINT
CENTER OF
SHAFT ON
OPERATOR
X
X
Point Y
Point Z
8